Hyperscale development

A campus strategy for multi-phase growth.

Coordinate dedicated facilities, customer standards, and future expansion within a larger development program. Start with the first usable deployment and the infrastructure needed to support it.

Your roadmap

A development program shaped around your roadmap.

ARX works from the intended load, technical standards, delivery sequence, and operating model. The aim is to establish a coherent campus program in which the first phase and later expansion can be evaluated together.

Key decisions

The decisions that shape a hyperscale campus.

  • Dedicated infrastructure

    Define the physical and operating boundaries required for the customer environment.

  • Phased capacity

    Match load releases to buildings, power infrastructure, equipment readiness, and acceptance milestones.

  • Customer standards

    Bring design criteria, security requirements, vendor interfaces, and testing expectations into the development brief.

  • Long-term operability

    Consider maintenance access, system isolation, expansion work, and operating responsibilities before the campus is handed over.

Interfaces

Make interfaces explicit.

A major campus may involve multiple owners, engineers, contractors, utilities, equipment suppliers, and operating teams. The development program needs clear package boundaries and a common view of what must be ready for each phase.

Conceptual illustration of the Pecos campus seen at dusk, with low-rise data hall blocks and mesas on the horizon.
Conceptual illustration. Final design may vary.

Flagship campus

Explore the Pecos mega-campus opportunity.

Pecos is the flagship ARX development for discussions about gigawatt-scale campus planning and substantial long-term requirements.

Explore Pecos

Bring your campus requirements into the conversation.

Share your initial and future load, location criteria, design standards, and intended delivery model.